1. Problem of different versions of software (user as well as operating system) contributes to ___.
Ans: Software Crisis
2. ____ a multi-function, integrated computer-based system that allows many office activities to be performed in an electronic mode.
Ans: Office Automation Systems (OAS).
3. ________ request for projects because they are often not satisfied with the amount of time that the staff takes to complete the job.
Ans: Department Managers
4. A system suffers from _______ if information is available but cannot be retrieved when and where it is needed.
Ans: The problem of timeliness
5. ____ occurs when system component is not large enough.
Ans: The problem of capacity
6. ____ benefits lead to reductions in administrative and operational costs.
Ans: Cost-savings
7. _____ arises when systems work all of the time but they draw incorrect conclusions.
Ans: The Problem of Validity
8. ________ arises in a system when processing is error-prone.
Ans: The Problem of Accuracy
9. _____ assist managers who must\nmake decisions that are not highly structured, often called unstructured\nor semi-structured decisions.
Ans: Decision Support System
10. ______ develops when system memory requirement of software is more than the existing requirements and/or availability.
Ans: software crisis
Comments